The original Seven Essays, in a cool, new outfit ...
Call 412-567-OXEN [6936] Fax 412-567-6936 Email - [email protected]

1. What are the major types of costs? Which costs are controllable by the project manager?

  1. (required)
  2. (valid email required)
 

1. What are the major types of costs? Which costs are controllable by the project manager?
2. Below is a project WBS with cost apportioned by percents. If the total project cost is estimated to be $600,000, what are the estimated costs for the following deliverables?
3. How does the WBS differ from the project network?
4.Why bother creating a WBS? Why not go straight to a project network and forget the WBS?